Tài liệu giám sát Phóng điện cục bộ – TGA-B For Motor and Generator

Tài liệu giám sát Phóng điện cục bộ – TGA-B For Motor and Generator

Why Test for Partial Discharge?

Breakdown Maintenance
 High Repair or replacement costs
 Preventative Maintenance (Time Based Maintenance)
 Scheduled during planned outages
 Predictive Maintenance (Condition Based Maintenance)
 Offers best benefits – maintenance costs and insulation life
 Requires on-line machine condition monitoring systems

How to prevent Motors and Generators from failure in-service?
Need a predictive maintenance tool
1. 50% due to bearing/vibration problems Mechanical
SOLUTION: On-Line Vibration Monitoring
2. 40% due to Stator Insulation Problems Electrical
SOLUTION: On-Line Partial Discharge Monitoring
3. 10% due to rotor problems Electrical
SOLUTION: On-Line Flux or CSA Monitoring